| ۱ | A comprehensive study of several meta-heuristic algorithms for open-pit mine production scheduling problem considering grade uncertainty | Kamyar Tolouei - Ehsan Moosavi - Amir Hossein Bangian Tabrizi- Peyman Afzal-Abbas Aghajani Bazzazi | Journal of Mining and Environment | 2020 | مقاله در نشریه |
| ۲ | APPLICATION OF AHP-TOPSIS METHOD FOR LOADING-HAULAGE EQUIPMENT SELECTION IN OPEN PIT MINES | A. Aghajani Bazazi- M. Osanloo | XXVII CONVENCIÓN INTERNACIONAL DE MINERÍA | 2007 | مقاله در همایش |
| ۳ | Alunite processing method selection using the AHP and TOPSIS approaches under fuzzy environment | Sh Alizadeh - MM Salari Rad - A Agahjani Bazzazi | International Journal of Mining Science and Technology | 2016 | مقاله در نشریه |
| ۴ | An efficient experimental model to estimate the performance of the raise borer drilling machine using linear and nonlinear regression approaches in the Azad Dam in Iran | Sirvan Moradi- Ali Aalianvari- Abbas Aghajani Bazzazi | Modeling Earth Systems and Environment | 2024-02-01 | مقاله در نشریه |
| ۵ | An optimisation approach for uncertainty-based long-term production scheduling in open-pit mines using meta-heuristic algorithms | Kamyar Tolouei-Ehsan Moosavi- Amir Hossein Bangian Tabrizi- Peyman Afzal-Abbas Aghajani Bazzazi | International Journal of Mining, Reclamation and Environment | 2021 | مقاله در نشریه |
| ۶ | Application of Controlled Blasting (Pre-splitting) Using Large Diameter holes in Sarcheshmeh Copper Mine | A.Aghajani Bazzazi-H.mansouri -M.A.Ebrahimi -A. Atash Panjeh | 8th International Symposium on Rock Fragmentation by Blasting | 2006 | مقاله در همایش |
| ۷ | Application of PCA, SVR, and ANFIS for modeling of rock fragmentation | M Esmaeili - C Drebenstedt - M Abbaszadeh - A Aghajani Bazzazi | Arabian Journal of Geosciences | 2015 | مقاله در نشریه |
| ۸ | Application of Sulphate-Reducing Bacteria (SRB) in acid mine drainage bioremediation | M. Golestanifar - A. Aghajani bazzazi - S Behzania | 1st INTERNATIONAL CONFERENCE on MANAGING THE SOCIAL AND ENVIRONMENTAL CONSEQUENCES OF COAL MINING IN INDIA | 2007 | مقاله در همایش |
| ۹ | Application of meta-heuristic optimization algorithm to determine the optimal cutoff grade of open pit mines | Mohammad Reza Ahmadi, - Abbas Aghajani Bazzazi | Arabian Journal of Geosciences | 2020 | مقاله در نشریه |
| ۱۰ | Application of simulated annealing for optimization of blasting costs due to air overpressure constraints in open-pit mines | H Bakhshandeh Amnieh- M Hakimiyan Bidgoli- H Mokhtari - A Aghajani Bazzazi | Journal of Mining and Environment | 2019 | مقاله در نشریه |
| ۱۱ | Cutoff grades optimization in open pit mines using meta-heuristic algorithms | Mohammad Reza Ahmadi-Abbas Aghajani Bazzazi | Resources Policy | 2019 | مقاله در نشریه |
| ۱۲ | Evaluating RBM performance considering the geometric parameters of the raise borer machine and the geomechanical properties of the rock | Sirvan Moradi -Ali Aalianvari- Abbas Aghajani Bazzazi | Iranian Journal of Earth Sciences | 2024-4-27 | مقاله در نشریه |
| ۱۳ | Financial risk management prediction of mining and industrial projects using combination of artificial intelligence and simulation methods | Sirvan Moradi- Seyed Davoud Mohammadi- Abbas Aghajani Bazzazi- Ali Aali Anvari- Ava Osmanpour | Journal of Mining and Environment | 2022-09-01 | مقاله در نشریه |
| ۱۴ | Improving performance of open-pit mine production scheduling problem under grade uncertainty by hybrid algorithms | Kamyar Tolouei - Ehsan Moosavi - Amir Hossein Bangian Tabrizi- Peyman Afzal-Abbas Aghajani Bazzazi | Journal of Central South University | 2020 | مقاله در نشریه |
| ۱۵ | Optimising the Loading System of Gol-e-Gohar Iron Ore Mine of Iran by Genetic Algorithm | A Aghajani - M Osanloo - M Akbarpour | Iron Ore Conference | 2007 | مقاله در همایش |
| ۱۶ | Optimization of Final Pit Limit with Regard to Effect of Commodity Price (Case Study: Se-Chahun Iron Ore Mine, Iran) | MR Mofidi- A Aghajani Bazzazi- N Karim | International Black Sea Mining & Tunnelling Symposium | 2016 | مقاله در همایش |
| ۱۷ | Optimizing Grouting Techniques for Controlling Water Seepage, Using Rain Optimization Technique | Hojat Nouri-Ali Aalianvari- Abbas Aghajani Bazzazi | Iranian Journal of Science and Technology, Transactions of Civil Engineering | 2024-06-01 | مقاله در نشریه |
| ۱۸ | Plant species selection by hybrid multiple-attribute decision-making model for promoting green mining in the Sungun copper mine, Iran | Abbas Aghajani Bazzazi- Ahmad Adib- Maryam Shapoori | Environmental Science and Pollution Research | 2022-12-01 | مقاله در نشریه |
| ۱۹ | Predicting and minimizing the blasting cost in limestone mines using a combination of gene expression programming and particle swarm optimization | Reza Bastami- Abbas Aghajani Bazzazi- Hadi Hamidian Shoormasti - Kaveh Ahangari | Archives of Mining Sciences | 2020 | مقاله در نشریه |
| ۲۰ | Prediction of Groundwater Inflow Rate Using Non-Linear Multiple Regression and ANFIS Models: A Case Study of Amirkabir Tunnel in Iran | M Moghaddasi - A Aghajani bazzazi- A Aalianvari | International Black Sea Mining & Tunnelling Symposium | 2016 | مقاله در همایش |