Abstract
The optimal cutoff grade leads to maximizing the profit or the net present value (NPV). One of the most important issues in open
pit mining is cutoff grade optimization with regard to NPV maximization over the mine life. The most famous method that
applied for cutoff grade optimization is the Lane methodology. Mining capacity, concentration plant capacity, and refining plant
capacity are the three major parts of the abovementioned methodology and further, more time value of money and ore grade
distribution are considered in Lane method. Repeated and cyclic calculations are the most disadvantages of lane methodology
and therefore, in this research, the imperialist competitive algorithm (ICA) as a robust meta-heuristic optimization method has
been applied to calculate the optimal cutoff grade. The accuracy of calculation was set to 0.001% and also the production of each
unit and the NPV have been determined by ICA method. The optimumcutoff grades have been obtained from 0.232 to 0.135% in
mine life time and NPV was calculated 37,750 billion Iranian Rials but the range of cutoff grades that calculated by Lane method
was from 0.233 to 0.155% and NPV was determined 37,434 billion Iranian Rials. The results of this study showed that the
determination of the optimum cutoff grade by the ICA has high accuracy and more speed of calculation in comparison with
traditional lane method.
tags: Optimumcutoff grade . Net present value . ICA . Sarcheshmeh copper mine