Authors | Hadi Mosadegh, Ehsan Khakbazan, Ali Salmasnia, Hadi Mokhtari |
---|---|
Journal | - |
Paper Type | Full Paper |
Published At | ۲۰۱۷-۵-۰۱ |
Journal Grade | ISI |
Journal Type | Typographic |
Journal Country | Iran, Islamic Republic Of |
Journal Index | SCOPUS |
Abstract
The aggregate production planning problem is one of the well-known planning problems in industries and manufacturing systems. It is implemented at an aggregated level without the need to provide detailed information about material and resource requirements for individual products. A multi-objective aggregate production planning problem is studied in current paper with four criteria, namely: 1) shortage and inventory; 2) overtime and idle time; 3) manpower level; 4) currency saving in a mid-term planning horizon. After describing the problem, a goal programming model is presented to formulate the problem mathematically and then a fuzzy goal programming model is utilised to encounter the uncertainties encountered in real-world systems. Unlike many previous works, this paper proposes a linear programming model which is solvable in a short time. Finally, to evaluate the performance, both models are verified with real data.