۴۱ | Economic Evaluation of Investment Projects Under Uncertainty: A Probability Theory Perspective | H. Mokhtari, S Kiani, S.S. Tahmasebpoor | Scientia Iranica | 2018-05-15 |
۴۲ | Economic Production Quantity Under Possible Substitution: A Scenario Analysis Approach | هادی مختاری,علی سلماس نیا,علی فلاحی | International Journal of Industrial Engineering & Production Research | 2022-03-10 |
۴۳ | Extended economic production quantity models with preventive maintenance | Hadi Mokhtari, Javad Asadkhani | SCI IRAN | 2020-12-14 |
۴۴ | Extended economic production quantity models with preventive maintenance | [3] H. Mokhtari and J Asadkhani. | Scientia Iranica | 2020-08-18 |
۴۵ | Fitting the Three-parameter Weibull Distribution by using Greedy Randomized Adaptive Search Procedure | Hadi Mokhtari, Ali Salmasnia | - | 2017-3-01 |
۴۶ | hybrid advertising media selection model using AHP and fuzzy-based GA decision making | H Tadrisi Javan, A. Khanlari, A, Motamedi, H. Mokhtari | NEURAL COMPUT APPL | 0-0-01 |
۴۷ | Joint decisions on inventory classification, supplier selection and production policy for a multi-item EPQ inventory system under uncertainty | فاطمه کرامتی,هادی مختاری,علی فلاحی | Journal of Quality Engineering and Production Optimization | 2022-12-26 |
۴۸ | Joint Ordering and Reuse Policy for Reusable Items Inventory Management | [10] H. Mokhtari | Sustainable Production and Consumption | 21-05-2018 |
۴۹ | Manufacturing operations outsourcing through an artificial team process algorithm | هادی مختاری | J INTELL FUZZY SYST | 2016-7-01 |
۵۰ | Multi-Product Constrained Economic Production Quantity Models for Imperfect Quality Items with Rework | Hadi Mokhtari, Aliakbar Hasani, Ali Fallahi | International Journal of Industrial Engineering & Production Research | 2021-06-19 |
۵۱ | Optimal lot size in a manufacturing system with imperfect raw materials and defective finished products | [5] H. Mokhtari | Scientia Iranica | 2020-05-25 |
۵۲ | Optimal lot-sizing under learning effect in inspection errors with different types of imperfect quality items | Javad Asadkhani, Hadi Mokhtari, Saman Tahmasebpoor | Operational Research | 2021-03-22 |
۵۳ | Optimizing the exploratory drilling rig route based on the Multi-Objective Multiple Traveling Salesman Problem | الهام قدیری صوفی,سعید سلطانی محمدی,هادی مختاری | Int. J. Min. Geo-Eng | 2022-05-09 |
۵۴ | Optimum Maintenance Strategy Selection using a Hybrid Approach based on Analytical Hierarchy Process and Revised Multi Choice Goal Programming | Ali Salmasnia, Ebrahim Asadi, Hadi Mokhtari | - | 2016-12-01 |
۵۵ | Pareto efficient correlated multi-response optimisation by considering customer satisfaction | علی سلماس نیا,هادی مختاری | International Journal of Quality Engineering and Technology | 2023-02-21 |
۵۶ | Redesign Strategies of a Comprehensive Robust Relief Network for Disaster Management | A. Hasani and H. Mokhtari, | Socio-Economic Planning Sciences | 2020-06-17 |
۵۷ | Research on group search optimizers for a reconfigurable flow shop sequencing problem | هادی مختاری | NEURAL COMPUT APPL | 0-0-01 |
۵۸ | Robust supplier selection in a closed loop supply chain using a hybrid approach based on design of experiments and simulation | علی سلماس نیا-سامان چراغی-علی قربانیان-هادی مختاری | International Journal of Applied Decision Sciences | 2015-8-01 |
۵۹ | Scheduling of printed circuit board (PCB) assembly systems with heterogeneous processors using simulation-based intelligent optimization methods | امیر نوروزی-هادی مختاری | NEURAL COMPUT APPL | 2015-5-01 |
۶۰ | Scheduling optimization of a stochastic flexible job-shop system with time-varying machine failure rate | هادی مختاری-مهرداد دادگر | COMPUT OPER RES | 2015-9-01 |