| Authors | سعید دوست علی,سید مرتضی بابامیر,مریم عینی کلشتری |
| Journal | CLUSTER COMPUT |
| IF | ثبت نشده |
| Paper Type | Full Paper |
| Published At | 2021-07-03 |
| Journal Grade | Scientific - research |
| Journal Type | Electronic |
| Journal Country | Iran, Islamic Republic Of |
| Journal Index | SCOPUS ,JCR |
Abstract
When each task of the longest path in a task-dependent scientific workflow must meet a deadline, the path is called critical.
Tasks in a critical path have priority over tasks in non-critical paths. Considering this fact that less methods have already
dealt with the critical path problem for workflow scheduling in cloud, this study aims to present a critical-path based
method to consider the problem based on our previous optimal workflow scheduling method, GWO-based (Grey Wolf
Optimization). We applied our study to balance and imbalance scientific workflows. Our results show that considering the
critical path improves the completion time of workflows while maintaining a proper level of resource cost and resource
utilization. Moreover, to show the effectiveness of the current study, we compared the performance of the proposed method
with non-critical-path aware algorithms, using three different indicators. The simulation demonstrates that compared to
PGWO as the base method, the proposed approach achieves (1) approximately 68% improvement for makespan, (2) more
accuracy in population sampling for about 70% of workflows, and (3) avoidance of the cost increases in more than 50% of
workflows. Moreover, the proposed method decreases makespan approximately 3 times compared to the constrained-based
approaches.