| 21 | Mixed model Two-sided Assembly Line Balancing in case of stochastic task times using Simulation-Based Optimization (Case Study: Beh Afarinan Datis Tiva Company) | Somayé Ghandi - Farzane Karimi | 16th Iranian International Industrial Engineering Conference | 2020-01-22 | Article In Conference |
| 22 | Review and Taxonomies of Assembly and Disassembly Path Planning Problems and Approaches | Somayé Ghandi - Ellips Masehian | Computer Aided Design (CAD) – ISI - | 2015-10-01 | Article In Publication |
| 23 | Assembly Sequence Planning of Rigid and Flexible Parts | Somayé Ghandi - Ellips Masehian | Journal of Manufacturing Systems – ISI - | 2015-07-01 | Article In Publication |
| 24 | A Breakout Local Search (BLS) Method for Solving the Assembly Sequence Planning Problem | Somayé Ghandi - Ellips Masehian | Engineering Applications of Artificial Intelligence (EAAI)- ISI- | 2014-12-16 | Article In Publication |
| 25 | A memetic algorithm for the resource-constrained project scheduling problem | Masome Mahdieh - Mehdi Ojaghloo - Somayé Ghandi | Proceedings of the 5th International Project Management Conference | 2009-10-26 | Article In Conference |
| 26 | A fuzzy goal programming method for optimizing the time-cost balance | Mehdi Ojaghloo - Somayé Ghandi | Proceedings of the 5th International Project Management Conference | 2009-10-26 | Article In Conference |
| 27 | (Solving the Parallel Machine Weighted Earliness and Tardiness Problem with a Multi-objective Scatter Search algorithm (in Persian | Reza Tavakkoli Moghaddam - Fariborz Jolai - Somayé Ghandi | The Technical Department of the University of Tehran Journal | 2009-02-20 | Article In Publication |
| 28 | Scheduling of industrial valve repair operations in the mechanical repair workshop of Mashal Pouya Espadana Company | Mehdi Pirzal , Somayé Ghandi | 10th International Conference on Industrial and Systems Engineering | 2024-09-18 - 2024-09-19 | Article In Conference |
| 29 | Forecasting of Iran's renewable energy consumption using a hybrid method of backpropagation neural network and Grey Wolf optimization algorithm | نفیسه احمدزاده,سمیه قندی بیدگلی,هادی مختاری | چهارمین کنفرانس بین المللی دانشجویان و مهندسان برق و انرژی های پاک | 2025-09-22 - 2025-09-22 | Article In Conference |
| 30 | Designing a business intelligence dashboard to analyze the performance of Kowsar Forghani's store | haniyeh jebeli, Somayé Ghandi | 19th Iranian International Industrial Engineering Conference | 2024-05-15 - 2024-05-16 | Article In Conference |
| 31 | Mathematical modeling and solution of flexible open shop scheduling problem considering reverse flows⸲ sequence-dependent setup time and job release time | Omid Ghafari, Somayé Ghandi | 19th Iranian International Industrial Engineering Conference | 2024-05-15 - 2024-05-16 | Article In Conference |
| 32 | تأثیر مدیریت پورتفولیو با استفاده از مدل ضمانت-سرمایهگذاری بر روی شاخصهای مالی شرکت مهندسی و ساختمان صنایع نفت | متین متقی,سمیه قندی بیدگلی | بیستمین کنفرانس بین المللی مهندسی صنایع ایران | 2025-05-14 - 2025-05-15 | Article In Conference |