۴۱ | Comparison of particle swarm optimization and simulated annealing for locating additional boreholes considering combined variance minimization | Saeid Soltani-Mohammadi, Mohammad Safa, Hadi Mokhtari | COMPUT GEOSCI-UK | 2016-10-01 |
۴۲ | A probabilistic portfolio budget allocation problem with CPI index under risk | امیر نوروزی-هادی مختاری-مرتضی باقرپور-سیدجعفر سجادی | Journal of Industrial and Production Engineering | 2016-1-01 |
۴۳ | A robust modelling and optimisation framework for a batch processing flow shop production system in the presence of uncertainties | کامران شاهنقی-هانی شاهمرادی-مقدم-امیر نوروزی-هادی مختاری | INT J COMPUT INTEG M | 2016-1-01 |
۴۴ | Scheduling optimization of a stochastic flexible job-shop system with time-varying machine failure rate | هادی مختاری-مهرداد دادگر | COMPUT OPER RES | 2015-9-01 |
۴۵ | An Evolutionary Clustering-Based Optimization to Minimize Total Weighted Completion Time Variance in a Multiple Machine Manufacturing System | هادی مختاری-علی سلماس نیا | nternational Journal of Information Technology & Decision Making | 2015-9-01 |
۴۶ | A desirability function-based approach for optimising generalised queuing networks | یحیی زارع مهرجردی-امین یزدخواستی-علی سلماس نیا-هادی مختاری | International Journal of Applied Management Science | 2015-8-01 |
۴۷ | Robust supplier selection in a closed loop supply chain using a hybrid approach based on design of experiments and simulation | علی سلماس نیا-سامان چراغی-علی قربانیان-هادی مختاری | International Journal of Applied Decision Sciences | 2015-8-01 |
۴۸ | Designing an Efficient Bi-Criteria Iterated Greedy Heuristic for Simultaneous Order Scheduling and Resource Allocation: A Balance between Cost and Lateness Measures | هادی مختاری | NEURAL COMPUT APPL | 2015-7-01 |
۴۹ | Scheduling of printed circuit board (PCB) assembly systems with heterogeneous processors using simulation-based intelligent optimization methods | امیر نوروزی-هادی مختاری | NEURAL COMPUT APPL | 2015-5-01 |
۵۰ | A Monte Carlo Simulation based Chaotic Differential Evolution Algorithm for Scheduling a Stochastic Parallel Processor System | هادی مختاری-علی سلماس نیا | EXPERT SYST APPL | 2015-5-01 |
۵۱ | A Bi-Objective Approach for Design of an Assembly Line Re-Balancing System: Mathematical Model and Differential Evolution Algorithms | هادی مختاری-اشکان مزدگیر | International Journal of Industrial Engineering & Production Research | 2015-3-01 |
۵۲ | A Reliability based Modelling and Optimization of an Integrated Production and Preventive Maintenance Activities in Flowshop Scheduling Problem | هادی مختاری-امیر نوروزی-صابر ملاعلیزاده زواردهی | International Journal of Engineering | 2015-12-01 |
۵۳ | A Particle Swarm Optimization Approach to Joint Location and Scheduling Decisions in a Flexible Job Shop Environment | حمید دلیری-هادی مختاری-عیسی نخعی کمال آبادی | International Journal of Engineering | 2015-12-01 |
۵۴ | A mixed integer linear programming formulation for a multi-stage, multi-Product, multi-vehicle aggregate production-distribution planning problem | هادی مختاری | Journal of Industrial Engineering and Management Studies | 2015-12-01 |
۵۵ | A nature inspired intelligent water drops evolutionary algorithm for parallel processor scheduling with rejection | هادی مختاری | APPL SOFT COMPUT | 2015-1-01 |
۵۶ | تحلیل اینترنت اشیاء با رویکرد مدل ساختاری تفسیری و تحلیل محتوا در زنجیره تأمین | امین مسعود بخشی موحد,محمد تقی رضوان,هادی مختاری | مدیریت فردا | ۱۴۰۲/۱۲/۱۰ |
۵۷ | hybrid advertising media selection model using AHP and fuzzy-based GA decision making | H Tadrisi Javan, A. Khanlari, A, Motamedi, H. Mokhtari | NEURAL COMPUT APPL | 0-0-01 |
۵۸ | A Multi-Objective Optimization for Brush Monofilament Tufting Process Design | Ali Salmasnia, Saeid Hasan Nejad, Hadi Mokhtari | Journal of Computational Design and Engineering | 0-0-01 |
۵۹ | A Computational Approach to Economic Production Quantity Model for Perishable Products with Backordering Shortage and Stock-Dependent Demand | هادی مختاری-علی نعیمی صدیق-علی سلماس نیا | SCI IRAN | 0-0-01 |
۶۰ | An efficient chaotic based PSO for earliness/tardiness optimization in a batch processing flow shop scheduling problem | هادی مختاری-امیر نوروزی | J INTELL MANUF | 0-0-01 |