CV


FA
Abbas Aghajani Bazzazi

Abbas Aghajani Bazzazi

Assistant Professor

a_aghajani_bazzazi@kashanu.ac.ir

College: Faculty of Engineering

Department: Mining Engineering

Degree: Ph.D

Birth Year: 1980

CV
FA
Abbas Aghajani Bazzazi

Assistant Professor Abbas Aghajani Bazzazi

a_aghajani_bazzazi@kashanu.ac.ir
College: Faculty of Engineering - Department: Mining Engineering Degree: Ph.D | Birth Year: 1980 |

Articles

#Paper TitleAuthorsPublication/ConferenceDateType
 
1A comprehensive study of several meta-heuristic algorithms for open-pit mine production scheduling problem considering grade uncertaintyKamyar Tolouei - Ehsan Moosavi - Amir Hossein Bangian Tabrizi- Peyman Afzal-Abbas Aghajani BazzaziJournal of Mining and Environment2020Article In Publication
2Predicting and minimizing the blasting cost in limestone mines using a combination of gene expression programming and particle swarm optimizationReza Bastami- Abbas Aghajani Bazzazi- Hadi Hamidian Shoormasti - Kaveh AhangariArchives of Mining Sciences2020Article In Publication
3Prediction of blasting cost in limestone mines using gene expression programming model and artificial neural networksReza Bastami- Abbas Aghajani Bazzazi- Hadi Hamidian Shoormasti- Kaveh AhangariJournal of Mining and Environment2020Article In Publication
4Improving performance of open-pit mine production scheduling problem under grade uncertainty by hybrid algorithmsKamyar Tolouei - Ehsan Moosavi - Amir Hossein Bangian Tabrizi- Peyman Afzal-Abbas Aghajani BazzaziJournal of Central South University2020Article In Publication
5Application of meta-heuristic optimization algorithm to determine the optimal cutoff grade of open pit minesMohammad Reza Ahmadi, - Abbas Aghajani BazzaziArabian Journal of Geosciences2020Article In Publication
6Cutoff grades optimization in open pit mines using meta-heuristic algorithmsMohammad Reza Ahmadi-Abbas Aghajani BazzaziResources Policy2019Article In Publication
7Application of simulated annealing for optimization of blasting costs due to air overpressure constraints in open-pit minesH Bakhshandeh Amnieh- M Hakimiyan Bidgoli- H Mokhtari - A Aghajani BazzaziJournal of Mining and Environment2019Article In Publication
8Sustainable rangeland management in southwest Iran: application of the AHP-TOPSIS approach in ranking livelihood alternativesHojatollah Khedrigharibvand-Hossein Azadi-Hosain Bahrami-Zbelo Tesfamariam-Abbas Aghajani Bazzazi-Philippe De Maeyer-Frank WitloxThe Rangeland Journal2018Article In Publication
9Reliability Analysis of Loader Equipment: A Case Study of a Galcheshmeh Travertine Quarry in IranM Taheri - A Aghajani BazzaziInternational Black Sea Mining & Tunnelling Symposium2016Article In Conference
10Optimization of Final Pit Limit with Regard to Effect of Commodity Price (Case Study: Se-Chahun Iron Ore Mine, Iran)MR Mofidi- A Aghajani Bazzazi- N KarimInternational Black Sea Mining & Tunnelling Symposium2016Article In Conference
11Prediction of Groundwater Inflow Rate Using Non-Linear Multiple Regression and ANFIS Models: A Case Study of Amirkabir Tunnel in IranM Moghaddasi - A Aghajani bazzazi- A AalianvariInternational Black Sea Mining & Tunnelling Symposium2016Article In Conference
12Alunite processing method selection using the AHP and TOPSIS approaches under fuzzy environmentSh Alizadeh - MM Salari Rad - A Agahjani BazzaziInternational Journal of Mining Science and Technology2016Article In Publication
13Application of PCA, SVR, and ANFIS for modeling of rock fragmentationM Esmaeili - C Drebenstedt - M Abbaszadeh - A Aghajani BazzaziArabian Journal of Geosciences2015Article In Publication
14Multiple regression, ANN and ANFIS models for prediction of backbreak in the open pit blastingM Esmaeili - M Osanloo- F Rashidinejad - A aghajani BazzaziEngineering with Computers2014Article In Publication
15Comparison Between Neural Networks and Multiple Regression Analysis to Predict Rock Fragmentation in Open-Pit MinesI Enayatollahi- A Aghajani Bazzazi- A AsadiRock Mechanics and Rock Engineering2014Article In Publication
16Prediction of Backbreak in Open Pit Blasting By Adaptive Neuro-Fuzzy Inference System (ANFIS) ModelA Aghajani Bazzazi- M EsmaeiliArchives of Mining Sciences2012Article In Publication
17Landfill site selection by decision-making tools based on fuzzy multi-attribute decision-making methodA Nazari- MM Salarirad- A Aghajani BazzaziEnvironmental Earth Sciences2012Article In Publication
18Reliability analysis of a fleet of loaders in Sangan iron mineM Esmaeili- A Aghajani Bazzazi - S BornaArchives of Mining Sciences2011Article In Publication
19A New Fuzzy Multi Criteria Decision Making Model For Open Pit Mines Equipment SelectionA Aghajani bazzazi- M osanloo - B KarimiAsia-Pacific Journal of Operational Research2011Article In Publication
20Loading-haulage equipment selection in open pit mines based on fuzzy-TOPSIS methodA. AGHAJANI BAZZAZI- M. OSANLOO- H. SOLTANMOHAMMADIGOSPODARKA SUROWCAMI MINERALNYMI2008Article In Publication
Showing 1-20 of 34 items.