| 21 | Single and Multi-Stage Manufacturing Systems Under Imperfect Quality Items with Random Defective Rate, Rework and Scrap | Hadi Mokhtari, Aliakbar Hasani, Saeed Dehnavi-Arani | SCI IRAN | 2021-07-07 |
| 22 | Multi-Product Constrained Economic Production Quantity Models for Imperfect Quality Items with Rework | Hadi Mokhtari, Aliakbar Hasani, Ali Fallahi | International Journal of Industrial Engineering & Production Research | 2021-06-19 |
| 23 | Optimal lot-sizing under learning effect in inspection errors with different types of imperfect quality items | Javad Asadkhani, Hadi Mokhtari, Saman Tahmasebpoor | Operational Research | 2021-03-22 |
| 24 | Extended economic production quantity models with preventive maintenance | Hadi Mokhtari, Javad Asadkhani | SCI IRAN | 2020-12-14 |
| 25 | A Multi-Product Humanitarian Supply Chain Network Design Problem: A Fuzzy Multi-objective and Robust Optimization Approach | علی فلاحی,اذین پورقاضی,هادی مختاری | International Journal of Engineering | 0000-00-00 |
| 26 | ارائهی مدل مقدار اقتصادی تولید (EPQ) با در نظر گرفتن تورم، ارزش زمانی پول و متغیر سرمایهگذاری در ظرفیت تولید | هادی مختاری و علی فلاحی | مهندسی صنایع و مدیریت شریف | 2018-05-12 |
| 27 | An energy-efficient multi-objective optimization for flexible job-shop scheduling problem | Hadi Mokhtari, Aliakbar Hasani | COMPUT CHEM ENG | 2017-9-01 |
| 28 | A multi-objective model for cleaner production-transportation planning in manufacturing plants via fuzzy goal programming | Hadi MOkhtari, Aliakbar Hasani | J MANUF SYST | 2017-7-01 |
| 29 | A fuzzy multi-objective goal programming model for solving an aggregate production planning problem with uncertainty | Hadi Mosadegh, Ehsan Khakbazan, Ali Salmasnia, Hadi Mokhtari | - | 2017-5-01 |
| 30 | Solving a multi-objective redundancy allocation problem under opportunistic maintenance strategy | Ali Salmasnia, Mohsen Afsahi, Hadi Mokhtari | - | 2017-4-01 |
| 31 | Fitting the Three-parameter Weibull Distribution by using Greedy Randomized Adaptive Search Procedure | Hadi Mokhtari, Ali Salmasnia | - | 2017-3-01 |
| 32 | A single-supplier, multi-buyer, multi-product VMI production-inventory system under partial backordering | Hadi Mokhtari, M. Taghi Rezvan | - | 2017-3-01 |
| 33 | Simultaneous Optimization of Production and Quality in a Deterioration Process | Ali Salmasnia, Hosein Fallah-Ghadi, Hadi Mokhtari | - | 2016-9-01 |
| 34 | Manufacturing operations outsourcing through an artificial team process algorithm | هادی مختاری | J INTELL FUZZY SYST | 2016-7-01 |
| 35 | A fixed and flexible maintenance operations planning in a parallel batch machines production system | Saber Molla-Alizadeh, Amir Noroozi, Hadi Mokhtari | - | 2016-6-01 |
| 36 | A Single Machine Capacitated Production Planning Problem Under Uncertainty: A Grey Linear Programming Approach | هادی مختاری | International Journal of Engineering | 2016-4-01 |
| 37 | A bi-objective airline revenue management problem with possible cancellation | محمد وردی-علی سلماس نیا-علی قربانیان-هادی مختاری | International Journal of Applied Management Science | 2016-2-01 |
| 38 | Optimum Maintenance Strategy Selection using a Hybrid Approach based on Analytical Hierarchy Process and Revised Multi Choice Goal Programming | Ali Salmasnia, Ebrahim Asadi, Hadi Mokhtari | - | 2016-12-01 |
| 39 | Comparison of particle swarm optimization and simulated annealing for locating additional boreholes considering combined variance minimization | Saeid Soltani-Mohammadi, Mohammad Safa, Hadi Mokhtari | COMPUT GEOSCI-UK | 2016-10-01 |
| 40 | A probabilistic portfolio budget allocation problem with CPI index under risk | امیر نوروزی-هادی مختاری-مرتضی باقرپور-سیدجعفر سجادی | Journal of Industrial and Production Engineering | 2016-1-01 |