مقالات در نشریات
# | عنوان مقاله | نویسندگان | نشریه | تاریخ انتشار |
---|---|---|---|---|
۲۱ | Application of PCA, SVR, and ANFIS for modeling of rock fragmentation | M Esmaeili - C Drebenstedt - M Abbaszadeh - A Aghajani Bazzazi | Arabian Journal of Geosciences | 2015 |
۲۲ | Application of meta-heuristic optimization algorithm to determine the optimal cutoff grade of open pit mines | Mohammad Reza Ahmadi, - Abbas Aghajani Bazzazi | Arabian Journal of Geosciences | 2020 |
۲۳ | An optimisation approach for uncertainty-based long-term production scheduling in open-pit mines using meta-heuristic algorithms | Kamyar Tolouei-Ehsan Moosavi- Amir Hossein Bangian Tabrizi- Peyman Afzal-Abbas Aghajani Bazzazi | International Journal of Mining, Reclamation and Environment | 2021 |
۲۴ | An analytical approach with a reliable logic and a ranking policy for post-mining land-use determination | Hossein Soltanmohammadi- Morteza Osanloo-Abbas Aghajani Bazzazi | Land Use Policy | 2010 |
۲۵ | Alunite processing method selection using the AHP and TOPSIS approaches under fuzzy environment | Sh Alizadeh - MM Salari Rad - A Agahjani Bazzazi | International Journal of Mining Science and Technology | 2016 |
۲۶ | Achieving to some outranking relationships between post mining land uses through mined land suitability analysis | H. Soltanmohammad-M. Osanloo-B. Rezaei-A. Aghajani Bazzazi | International Journal of Environmental Science & Technology | 2008 |
۲۷ | A New Fuzzy Multi Criteria Decision Making Model For Open Pit Mines Equipment Selection | A Aghajani bazzazi- M osanloo - B Karimi | Asia-Pacific Journal of Operational Research | 2011 |
۲۸ | A comprehensive study of several meta-heuristic algorithms for open-pit mine production scheduling problem considering grade uncertainty | Kamyar Tolouei - Ehsan Moosavi - Amir Hossein Bangian Tabrizi- Peyman Afzal-Abbas Aghajani Bazzazi | Journal of Mining and Environment | 2020 |
نمایش ۲۱ تا ۲۸ مورد از کل ۲۸ مورد.