مقالات در نشریات

#عنوان مقالهنویسندگاننشریهتاریخ انتشار
 
۱Concurrent scheduling and lot sizing in a flexible flow shop environment considering intermediate and public buffersFateme Mohaymeni- Somayé GhandiModern Researches in Decision Making2023-10-07
۲Mathematical modeling and solving the Flexible Flow Shop scheduling problem with reverse flows and the limitation of access to machinesSomayé Ghandi- Reihane BonroodiJournal of Industrial Engineering Research in Production Systems2023-02-20
۳مدلسازی ریاضی و حل مسأله زمانبندی جریان کارگاهی بدون انتظار با درنظر گرفتن زمان آزادسازی و فعالیتهای نگهداری و تعمیرات پیشگیرانهپریا خاکساری,سمیه قندی بیدگلینشـریه پـژوهـشهای مهنـدسـی صنــایع در سیستـمهـای تولیــد1402/12/20
۴Fitness landscape analysis of the simple assembly line balancing problem type 1Somayé Ghandi - Ellips MasehianInternational Journal of Industrial Engineering Computations2023-09-12
۵Mathematical Modeling and Solving the no-Wait Flow Shop Scheduling Problem Considering the Release Times and Preventive Maintenance ActivitiesPariya Khaksari- Somayé GhandiJournal of Industrial Engineering Research in Production Systems2024-01-31
۶Multi Agent Flow Shop Scheduling Model with Deteriorating Jobs and Sequence-Dependent Setup Times Using Multi Objective Particle Swarm Optimization (MOPSO) AlgorithmSomayé Ghandi- Marzie Amini RaraniJournal of Industrial Engineering Research in Production Systems2021-06-26
۷A Simulation-Based Optimization Approach for Mixed model Two-sided Assembly Line Balancing with stochastic task times (Case Study: Beh Afarinan Datis Tiva Company)Somayé Ghandi- Marzie KarimiJournal of Industrial Engineering Research in Production Systems2020-06-05
۸(Solving the Parallel Machine Weighted Earliness and Tardiness Problem with a Multi-objective Scatter Search algorithm (in PersianReza Tavakkoli Moghaddam - Fariborz Jolai - Somayé GhandiThe Technical Department of the University of Tehran Journal2009-02-20
۹Comparison of Various Machine Learning Methods for Automatic Control and Guidance of Mobile RobotSomayé Ghandi- Hadi MokhtariJournal of Artificial Intelligence and Data Mining (JAIDM)2022-03-13
۱۰Landscape Analysis and a Hybrid Iterated Local Search (HILS) for Solving the Simple Assembly Line Balancing Problem type 2 (SALBP2)Somayé Ghandi- Nafise GhazaviJournal of Quality Engineering and Production Optimization2021-11-29
۱۱Assembly sequence and path planning for monotone and nonmonotone assemblies with rigid and flexible partsEllips Masehian -Somayé GhandiRobotics and Computer-Integrated Manufacturing2021-04-19
۱۲Improved many-objective particle swarm optimization algorithm for scientific workflow scheduling in cloud computingSahar Saeedi, Reihaneh Khorsand, Somayé Ghandi , Mohammadreza RamezanpourComputers & Industrial Engineering2020-07-12
۱۳ASPPR: A new Assembly Sequence and Path Planner/ Replanner for monotone and nonmonotone assembly planningEllips Masehian, Somayé GhandiComputer-Aided Design2020-02-22
۱۴Review and Taxonomies of Assembly and Disassembly Path Planning Problems and ApproachesSomayé Ghandi - Ellips MasehianComputer Aided Design (CAD) – ISI -2015-10-01
۱۵Assembly Sequence Planning of Rigid and Flexible PartsSomayé Ghandi - Ellips MasehianJournal of Manufacturing Systems – ISI -2015-07-01
۱۶A Breakout Local Search (BLS) Method for Solving the Assembly Sequence Planning ProblemSomayé Ghandi - Ellips MasehianEngineering Applications of Artificial Intelligence (EAAI)- ISI-2014-12-16
نمایش ۱ تا ۱۶ مورد از کل ۱۶ مورد.