Research Projects
- Mineral Processing Modelling, Simulation and Control
- Comminution (High voltage electric pulse fragmentation)
- Mineral Processing Methods (Physical Separation)
SELECTED RESEARCH EXPERIENCE
- Guidelines for mineral identification and liberation in mineral processing
- Guidelines for conducting mineral processing tests at various scales
- Guidelines for tailings and waste disposal in mineral processing plants
- Environmental guidelines for mining activities
- Pilot-scale comminution and magnetic separation tests and regrinding circuit design for Kabar concentrate – Jalalabad oxidized iron ore
- Mineral processing investigation on preliminary concentrate of Gol-e-Gohar iron ore
- Comminution circuit design tests for Ardakan glass sand ore
- Pilot-scale comminution and classification tests on Yazd alumina and chromite samples
- Comminution tests for Agh Darreh gold sample
- Design and execution of column flotation tests on Nakhlak lead ore
- Sedimentation and filtration tests on tailings and concentrate samples of Jalalabad iron ore
- Low-intensity dry and wet magnetic separation tests on Jalalabad iron ore sample
- Design and execution of processing tests for the kaolin sample of East Silicate Company
- Design and execution of heavy media separation tests on Vonarch manganese sample, Qom
- Pilot-scale design and testing for fines reduction in the grinding circuit of Asforudi Phosphate Complex
- Simulation, design, and implementation of pilot-scale comminution and beneficiation circuit for Sangan iron ore aiming to produce the initial feed required for pelletizing plant design
- Pilot-scale design and testing for the beneficiation of iron ore from Jahannemo Industrial and Mining Company
- Design and fabrication of a laboratory-scale mineral comminution device using high-voltage electrical pulses
- Consulting on the design and fabrication of a 5 t/h heavy media cyclone and its installation and commissioning in Tabas Fluorine Mine
- Research project entitled “Laboratory Feasibility Studies on the Processing of Tang-e Zagh Iron Ore Mine with Acceptable Recovery and Grade”, Client: Omran Moman Chabahar Industrial and Mining Company, Project Collaborators: Dr. Abdollahzadeh, Mr. Taheri, and Mr. Javadi, 2016–2018.
- Applied project entitled “Investigation of the Comprehensive Development Plan for High-Voltage Electrical Comminution Method with the Aim of Localization and Development in Iran”, 2024, Client: Iranian Minerals Processing Research Center (IMPRC).