Thesis

- Ball mill modelling using minerals grade distribution function

- Extraction of rare earth elements from Esfordi phosphate concentrate

- Kinetic design of grinding circuits of Golestan iron ore: Ghamsar-Kashan

Optimization of the grinding circuit and the magnetic separator of the 4th operating line of Gole-e-Gohar concentrator using the USIM PAC Simulator

- Investigation of the effect of crushing on the size and shape of sand aggregates and the compressive strength of concrete using image processing

Feasibility Study of Au-Cu Extraction From Saveh-Sarighash Gold-Copper Ore

-Investigation of important parameters in tailings dewatering circuits of waste thickener of Gol-Gohar lines 5, 6 and 7

Kinetic Simulation of Primary Ball Mill of Hamedan Iron Ore Complex

-Investigating the Hardness of feed of the Gol Gohar plants